PR 313 bridge to be raised and widened over Winnipeg River at Lac du Bonnet
Manitoba Infrastructure advises the height of the existing PR 313 bridge over the Winnipeg River at Lac du Bonnet will be raised by three feet and create a navigational clearance of 15 ft. It will also be widened to accommodate a new sidewalk.
Posted: 07/31/2016